| Assessment Year | 2026 |
|---|---|
| Principal Product | Molded Plastic Tanks |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 175 |
| Plant Area |
255,000
ft2
|
| Annual Production | 14,500
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $295,886 | 4,049,746 |
kWh
|
$0.073 | |
| Electricity Demand | $162,331 | 12,388 |
kW-mo/yr
|
$13.10 | |
| Electricity Fees | $24,063 | - |
|
- | |
| Natural Gas | $217,651 | 39,998 |
MMBtu
|
$5.44 | |
| Waste Disposal Costs | |||||
| Water Usage | $4,452 | 431 |
Tgal
|
$10.34 | |
| Water Disposal | $2,525 | 431 |
Tgal
|
$5.86 | |
| TOTAL YEARLY COSTS | $706,908 | ||||
| RECOMMENDED SAVINGS* | $167,499 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $23,834 | $110,000 |
$15,633
217,160
kWh
|
$8,201
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $39,450 | $85,000 | - | - | - |
$39,450
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,889 | $1,540 |
$5,889
81,786
kWh
|
- | - | - | - | |
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $5,605 | $11,000 |
$4,053
56,304
kWh
|
- | - |
$1,552
-
MMBtu
|
- | |
| 05 | 2.9114: Use solar heat to make electricty | $65,621 | $501,300 |
$65,621
911,413
kWh
|
- | - | - | - | |
| 06 | 2.3212: Optimize plant power factor | $13,093 | $37,500 | - | - | $13,093 | - | - | |
| 07 | 2.2437: Recover waste heat from equipment | $2,665 | $10,000 | - | - | - |
$2,665
-
MMBtu
|
- | |
| 08 | 2.7135: Install occupancy sensors | $3,928 | $29,670 |
$3,928
54,560
kWh
|
- | - | - | - | |
| 09 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $193 | $600 |
$193
2,680
kWh
|
- | - | - | - | |
| 10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,035 | $60 |
$1,990
27,643
kWh
|
$1,045
-
kW-mo/yr
|
- | - | - | |
| 11 | 2.2511: Insulate bare equipment | $4,186 | $31,011 | - | - | - | - | $4,186 | |
| TOTAL RECOMMENDED | $167,499 | $817,681 |
$97,307
1,351,546
kWh
|
$9,246
-
kW-mo/yr
|
$13,093 |
$43,667
-
MMBtu
|
$4,186 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs