ITAC Assessment: TT0354
ITAC logo
ITAC Assessment: TT0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Molded Plastic Tanks
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 255,000
ft2
Annual Production 14,500
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $295,886 4,049,746
kWh
Electricity Demand $162,331 12,388
kW-mo/yr
Electricity Fees $24,063 -
Natural Gas $217,651 39,998
MMBtu
Waste Disposal Costs
Water Usage $4,452 431
Tgal
Water Disposal $2,525 431
Tgal
TOTAL YEARLY COSTS $706,908
RECOMMENDED SAVINGS* $167,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2622: Replace existing chiller with high efficiency model $23,834 $110,000 $15,633
217,160
kWh
$8,201
-
kW-mo/yr
- - -
02 2.2443: Re-use or recycle hot or cold process exhaust air $39,450 $85,000 - - - $39,450
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,889 $1,540 $5,889
81,786
kWh
- - - -
04 2.7241: Install outside air damper / economizer on hvac unit $5,605 $11,000 $4,053
56,304
kWh
- - $1,552
-
MMBtu
-
05 2.9114: Use solar heat to make electricty $65,621 $501,300 $65,621
911,413
kWh
- - - -
06 2.3212: Optimize plant power factor $13,093 $37,500 - - $13,093 - -
07 2.2437: Recover waste heat from equipment $2,665 $10,000 - - - $2,665
-
MMBtu
-
08 2.7135: Install occupancy sensors $3,928 $29,670 $3,928
54,560
kWh
- - - -
09 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $193 $600 $193
2,680
kWh
- - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $3,035 $60 $1,990
27,643
kWh
$1,045
-
kW-mo/yr
- - -
11 2.2511: Insulate bare equipment $4,186 $31,011 - - - - $4,186
TOTAL RECOMMENDED $167,499 $817,681 $97,307
1,351,546
kWh
$9,246
-
kW-mo/yr
$13,093 $43,667
-
MMBtu
$4,186
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs