ITAC Assessment: AR0116
ITAC logo
ITAC Assessment: AR0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Breading Batter
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 125,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,120 4,306,858
kWh
Electricity Demand $52,625 9,435
kW-mo/yr
Natural Gas $156,980 50,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,449 $575 $1,100
34,291
kWh
$349
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $1,541 $2,100 $1,207
37,808
kWh
$334
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,366 $45 $1,987
62,134
kWh
$379
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $427 $80 $345
10,844
kWh
$82
-
kW-mo/yr
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $4,571 $14,000 - - $4,571
-
MMBtu
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $5,922 - - - - $5,922
-
lb
-
07 3.5217: Reuse / recycle/ sell paper products $544 - - - - $544
-
lb
-
08 4.423: Move product using mechanical means $30,133 $37,400 - - - - $30,133
TOTAL RECOMMENDED $46,953 $54,200 $4,639
145,077
kWh
$1,144
-
kW-mo/yr
$4,571
-
MMBtu
$6,466
-
lb
$30,133
TOTAL IMPLEMENTED $10,373 $2,145 $3,194
99,942
kWh
$713
-
kW-mo/yr
- $6,466
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs