ITAC Assessment: TT0352
ITAC logo
ITAC Assessment: TT0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Galvanized Steel
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 25,800
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 3,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,771 595,459
kWh
Electricity Demand $37,155 2,292
kW-mo/yr
Electricity Fees $17,237 -
Natural Gas $248,543 30,033
MMBtu
Waste Disposal Costs
Water Usage $21,491 3,543
Tgal
Water Disposal $643 58
Tgal
TOTAL YEARLY COSTS $373,840
RECOMMENDED SAVINGS* $115,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $35,187 $5,549 - - $35,187
-
MMBtu
-
02 2.8114: Change rate schedules or other changes in utility service $21,856 - - $21,856 - -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $15,578 $3,250 $15,578
189,975
kWh
- - -
04 2.8114: Change rate schedules or other changes in utility service $12,244 $70 - - - $12,244
05 2.2414: Use waste heat from hot flue gases to preheat $10,677 $40,000 - - $10,677
-
MMBtu
-
06 2.4239: Eliminate or reduce compressed air usage $7,404 $16,000 $7,404
90,292
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,550 $330 $5,550
67,683
kWh
- - -
08 3.7131: Use a rag recycle service $1,440 - - - - $1,440
09 2.4239: Eliminate or reduce compressed air usage $3,528 - $3,528
43,024
kWh
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,189 $2,060 $1,189
14,500
kWh
- - -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $596 $300 $596
7,274
kWh
- - -
12 2.7135: Install occupancy sensors $576 $805 $576
7,020
kWh
- - -
TOTAL RECOMMENDED $115,825 $68,364 $34,421
419,768
kWh
$21,856 $45,864
-
MMBtu
$13,684
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs