| Assessment Year | 2026 |
|---|---|
| Principal Product | Steering Columns |
| NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 382 |
| Plant Area |
200,000
ft2
|
| Annual Production | 36,000,000
units
|
| Production Hrs. Annual | 7,000
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $338,726 | 4,708,370 |
kWh
|
$0.072 | |
| Electricity Demand | $166,065 | 12,466 |
kW-mo/yr
|
$13.32 | |
| Natural Gas | $16,528 | 2,757 |
MMBtu
|
$5.99 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,277 | 1,213 |
Tgal
|
$4.35 | |
| Water Disposal | $6,732 | 1,213 |
Tgal
|
$5.55 | |
| TOTAL YEARLY COSTS | $533,328 | ||||
| RECOMMENDED SAVINGS* | $63,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $26,487 | $1,500 |
$20,061
279,008
kWh
|
$6,426
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,365 | $32,000 |
$6,127
85,224
kWh
|
$2,238
-
kW-mo/yr
|
- | |
| 03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $7,552 | $4,372 | - | - |
$7,552
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,893 | $7,500 |
$6,893
95,869
kWh
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $5,264 | $9,750 |
$5,264
73,216
kWh
|
- | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $4,128 | $3,325 |
$4,128
57,419
kWh
|
- | - | |
| 07 | 2.7229: Air condition only space necessary | $3,921 | $13,700 |
$3,921
54,530
kWh
|
- | - | |
| 08 | 2.2437: Recover waste heat from equipment | $866 | $2,100 |
$674
9,379
kWh
|
- |
$192
-
MMBtu
|
|
| TOTAL RECOMMENDED | $63,476 | $74,247 |
$47,068
654,645
kWh
|
$8,664
-
kW-mo/yr
|
$7,744
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs