ITAC Assessment: TT0350
ITAC logo
ITAC Assessment: TT0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Steering Columns
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 382
Plant Area 200,000
ft2
Annual Production 36,000,000
units
Production Hrs. Annual 7,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,726 4,708,370
kWh
Electricity Demand $166,065 12,466
kW-mo/yr
Natural Gas $16,528 2,757
MMBtu
Waste Disposal Costs
Water Usage $5,277 1,213
Tgal
Water Disposal $6,732 1,213
Tgal
TOTAL YEARLY COSTS $533,328
RECOMMENDED SAVINGS* $63,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $26,487 $1,500 $20,061
279,008
kWh
$6,426
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,365 $32,000 $6,127
85,224
kWh
$2,238
-
kW-mo/yr
-
03 2.2449: Recover heat from exhausted steam, hot air or hot water $7,552 $4,372 - - $7,552
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,893 $7,500 $6,893
95,869
kWh
- -
05 2.7135: Install occupancy sensors $5,264 $9,750 $5,264
73,216
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $4,128 $3,325 $4,128
57,419
kWh
- -
07 2.7229: Air condition only space necessary $3,921 $13,700 $3,921
54,530
kWh
- -
08 2.2437: Recover waste heat from equipment $866 $2,100 $674
9,379
kWh
- $192
-
MMBtu
TOTAL RECOMMENDED $63,476 $74,247 $47,068
654,645
kWh
$8,664
-
kW-mo/yr
$7,744
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs