ITAC Assessment: TT0327
ITAC logo
ITAC Assessment: TT0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product HDPE and PET Containers
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 141,000
ft2
Annual Production 9,600,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $468,780 10,639,374
kWh
Electricity Demand $253,696 34,812
kW-mo/yr
Natural Gas $6,764 538
MMBtu
Waste Disposal Costs
Water Usage $12,629 3,570
Tgal
Water Disposal $9,633 482
Tgal
TOTAL YEARLY COSTS $751,502
RECOMMENDED SAVINGS* $140,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,321 - $3,321
74,296
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $1,048 - - - - $1,048
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $998 $120 $998
22,316
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,500 $550 $2,454
54,894
kWh
$46
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $39,392 $20,000 $39,392
881,256
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,254 $1,491 $992
22,194
kWh
$262
-
kW-mo/yr
- -
07 4.721: Initiate a program to acquire iso certification $17,852 $35,000 $17,602
393,657
kWh
- $250
-
MMBtu
-
08 2.3212: Optimize plant power factor $8,101 $31,875 - - - $8,101
09 2.9113: Use solar heat for heat $66,246 $798,795 $66,246
1,482,015
kWh
- - -
TOTAL RECOMMENDED $140,712 $887,831 $131,005
2,930,628
kWh
$308
-
kW-mo/yr
$250
-
MMBtu
$9,149
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs