Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 312,588
ft2
Annual Production 1,600
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $523,008 7,353,360
kWh
Electricity Demand $269,785 19,317
kW-mo/yr
Electricity Fees $(-157,805.0) -
Natural Gas $858,039 77,460
MMBtu
Waste Disposal Costs
Water Usage $24,426 2,959
Tgal
Water Disposal $10,460 1,208
Tgal
TOTAL YEARLY COSTS $1,527,913
RECOMMENDED SAVINGS* $155,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.212: Adopt in-house material generation $30,976 $12,000 $(-43.4)
(-610)
kWh
- - $31,019
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,445 $1,710 $2,445
34,379
kWh
- - -
03 2.2437: Recover waste heat from equipment $17,320 $15,000 - - $17,320
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,949 $23,783 $8,700
122,310
kWh
$10,249
-
kW-mo/yr
- -
05 3.4116: Meter recycled water (to reduce sewer charges) $6,052 $7,500 - - - $6,052
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,087 $6,080 $2,087
29,340
kWh
- - -
07 2.9114: Use solar heat to make electricty $57,337 $238,118 $57,337
806,091
kWh
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,037 $75,000 $10,961
154,100
kWh
$1,076
-
kW-mo/yr
- -
09 2.4239: Eliminate or reduce compressed air usage $8,140 $26,000 $8,140
114,433
kWh
- - -
TOTAL RECOMMENDED $155,343 $405,191 $89,627
1,260,043
kWh
$11,325
-
kW-mo/yr
$17,320
-
MMBtu
$37,071
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs