ITAC Assessment: TT0310
ITAC logo
ITAC Assessment: TT0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Breads and buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 235
Plant Area 232,000
ft2
Annual Production 75,250,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $517,632 6,162,654
kWh
Electricity Demand $169,512 10,917
kW-mo/yr
Electricity Fees $(-46,138.0) -
Natural Gas $359,175 51,154
MMBtu
Waste Disposal Costs
Water Usage $69,824 7,160
Tgal
Water Disposal $85,450 7,160
Tgal
TOTAL YEARLY COSTS $1,155,455
RECOMMENDED SAVINGS* $64,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $25,939 $3,600 $20,489
243,923
kWh
$5,450
-
kW-mo/yr
- - -
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,414 $17,000 - - - - $10,414
03 2.2437: Recover waste heat from equipment $9,068 $12,500 - - - $9,068
-
MMBtu
-
04 2.3212: Optimize plant power factor $7,227 $9,500 - - $7,227 - -
05 2.7135: Install occupancy sensors $6,590 $2,200 $5,087
60,565
kWh
$1,503
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,799 $60 $3,796
45,192
kWh
$1,003
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $335 $75 $335
3,994
kWh
- - - -
TOTAL RECOMMENDED $64,372 $44,935 $29,707
353,674
kWh
$7,956
-
kW-mo/yr
$7,227 $9,068
-
MMBtu
$10,414
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs