ITAC Assessment: TT0292
ITAC logo
ITAC Assessment: TT0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Engine Transmissions
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 264,300
ft2
Annual Production 1,100,000
units
Production Hrs. Annual 6,900
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $642,018 9,516,030
kWh
Electricity Demand $253,025 19,692
kW-mo/yr
Natural Gas $34,262 3,194
MMBtu
Waste Disposal Costs
Water Usage $6,195 2,668
Tgal
Water Disposal $34,272 2,668
Tgal
TOTAL YEARLY COSTS $969,772
RECOMMENDED SAVINGS* $73,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,746

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 3.6192: Use a less expensive method of waste removal $28,974 $250 - - $(-87.0)
-
MMBtu
$(-412.0) $29,473
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,314 $15,941 $11,400
168,899
kWh
$2,915
-
kW-mo/yr
- - -
03 2.7229: Air condition only space necessary $8,884 $18,000 $2,739
40,579
kWh
- $6,145
-
MMBtu
- -
04 2.8114: Change rate schedules or other changes in utility service $6,900 $600 - - - - $6,900
05 2.4221: Install compressor air intakes in coolest locations $6,004 $4,240 $4,527
67,060
kWh
$1,477
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,057 $2,190 $5,057
74,918
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,223 $4,750 $2,223
32,936
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,268 $50 $1,268
18,780
kWh
- - - -
TOTAL RECOMMENDED $73,624 $46,021 $27,213
403,172
kWh
$4,392
-
kW-mo/yr
$6,058
-
MMBtu
$(-412.0) $36,373
TOTAL IMPLEMENTED $31,746 $40,931 $22,686
336,112
kWh
$2,915
-
kW-mo/yr
$6,145
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs