Assessment Year | 2023 |
---|---|
Principal Product | drive shafts |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
140,000
ft2
|
Annual Production | 75,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $290,148 | 3,728,000 |
kWh
|
$0.078 | |
Electricity Demand | $120,120 | 8,379 |
kW-mo/yr
|
$14.34 | |
Electricity Fees | $7,709 | - |
|
- | |
Natural Gas | $18,032 | 1,660 |
MMBtu
|
$10.86 | |
Waste Disposal Costs | |||||
Water Usage | $14,680 | 2,433 |
Tgal
|
$6.03 | |
Water Disposal | $32,843 | 2,433 |
Tgal
|
$13.50 | |
TOTAL YEARLY COSTS | $483,532 | ||||
RECOMMENDED SAVINGS* | $63,944 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $22,243 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $15,705 | $50,300 |
$15,705
201,875
kWh
|
- | - | - | - | - | |
02 | 3.4151: Minimize water usage | $10,675 | $240 | - | - | - | - |
$7,379
-
Tgal
|
$3,296
-
Tgal
|
|
03 | 2.2437: Recover waste heat from equipment | $8,764 | $13,000 | - | - | - |
$8,764
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,557 | $3,205 |
$8,557
109,993
kWh
|
- | - | - | - | - | |
05 | 2.7234: Use heat pump for space conditioning | $7,905 | $7,500 |
$7,905
101,611
kWh
|
- | - | - | - | - | |
06 | 2.7229: Air condition only space necessary | $3,153 | $6,000 |
$1,176
15,120
kWh
|
- | - |
$1,977
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,804 | $10,150 |
$2,070
26,604
kWh
|
$734
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.3212: Optimize plant power factor | $2,266 | $3,750 | - | - | $2,266 | - | - | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,087 | $1,600 |
$2,087
26,820
kWh
|
- | - | - | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,028 | $60 |
$2,028
26,064
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $63,944 | $95,805 |
$39,528
508,087
kWh
|
$734
-
kW-mo/yr
|
$2,266 |
$10,741
-
MMBtu
|
$7,379
-
Tgal
|
$3,296
-
Tgal
|
||
TOTAL IMPLEMENTED | $22,243 | $23,390 |
$2,070
26,604
kWh
|
$734
-
kW-mo/yr
|
- |
$8,764
-
MMBtu
|
$7,379
-
Tgal
|
$3,296
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs