ITAC Assessment: TT0284
ITAC logo
ITAC Assessment: TT0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product drive shafts
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 140,000
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,148 3,728,000
kWh
Electricity Demand $120,120 8,379
kW-mo/yr
Electricity Fees $7,709 -
Natural Gas $18,032 1,660
MMBtu
Waste Disposal Costs
Water Usage $14,680 2,433
Tgal
Water Disposal $32,843 2,433
Tgal
TOTAL YEARLY COSTS $483,532
RECOMMENDED SAVINGS* $63,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,243

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 2.9114: Use solar heat to make electricty $15,705 $50,300 $15,705
201,875
kWh
- - - - -
02 3.4151: Minimize water usage $10,675 $240 - - - - $7,379
-
Tgal
$3,296
-
Tgal
03 2.2437: Recover waste heat from equipment $8,764 $13,000 - - - $8,764
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,557 $3,205 $8,557
109,993
kWh
- - - - -
05 2.7234: Use heat pump for space conditioning $7,905 $7,500 $7,905
101,611
kWh
- - - - -
06 2.7229: Air condition only space necessary $3,153 $6,000 $1,176
15,120
kWh
- - $1,977
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,804 $10,150 $2,070
26,604
kWh
$734
-
kW-mo/yr
- - - -
08 2.3212: Optimize plant power factor $2,266 $3,750 - - $2,266 - - -
09 2.6212: Turn off equipment during breaks, reduce operating time $2,087 $1,600 $2,087
26,820
kWh
- - - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,028 $60 $2,028
26,064
kWh
- - - - -
TOTAL RECOMMENDED $63,944 $95,805 $39,528
508,087
kWh
$734
-
kW-mo/yr
$2,266 $10,741
-
MMBtu
$7,379
-
Tgal
$3,296
-
Tgal
TOTAL IMPLEMENTED $22,243 $23,390 $2,070
26,604
kWh
$734
-
kW-mo/yr
- $8,764
-
MMBtu
$7,379
-
Tgal
$3,296
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs