ITAC Assessment: TT0273
ITAC logo
ITAC Assessment: TT0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Exterior Automotive Mirrors
NAICS 336111: Automobile Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 650
Plant Area 310,000
ft2
Annual Production 32,825,809
units
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $673,037 15,873,707
kWh
Electricity Demand $329,942 27,282
kW-mo/yr
Natural Gas $513,573 49,773
MMBtu
Waste Disposal Costs
Water Usage $41,457 10,533
Tgal
Water Disposal $64,047 10,533
Tgal
TOTAL YEARLY COSTS $1,622,056
RECOMMENDED SAVINGS* $328,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,599

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $197,305 $1,241,200 $152,425
3,594,939
kWh
$62,094
-
kW-mo/yr
$(-17,214.0)
-
MMBtu
-
02 2.6212: Turn off equipment during breaks, reduce operating time $65,016 $5,000 - - $65,016
-
MMBtu
-
03 2.2511: Insulate bare equipment $51,693 $8,551 - - $51,693
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,155 $2,860 $6,155
145,165
kWh
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $3,192 $2,000 - $3,192
-
kW-mo/yr
- -
06 3.4116: Meter recycled water (to reduce sewer charges) $1,707 $400 - - - $1,707
-
Tgal
07 2.2511: Insulate bare equipment $1,084 $428 - - $1,084
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,072 $1,926 $762
17,976
kWh
$310
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $780 $2,250 $551
13,007
kWh
$229
-
kW-mo/yr
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $633 $1,500 $447
10,537
kWh
$186
-
kW-mo/yr
- -
11 2.6212: Turn off equipment during breaks, reduce operating time $356 $700 $356
8,400
kWh
- - -
TOTAL RECOMMENDED $328,993 $1,266,815 $160,696
3,790,024
kWh
$66,011
-
kW-mo/yr
$100,579
-
MMBtu
$1,707
-
Tgal
TOTAL IMPLEMENTED $72,599 $10,486 $7,273
171,541
kWh
$310
-
kW-mo/yr
$65,016
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs