ITAC Assessment: MI0434
ITAC logo
ITAC Assessment: MI0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electronic Components
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 100,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 3,223
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,153 3,135,737
kWh
Electricity Demand $135,986 8,185
kW-mo/yr
Electricity Fees $9,209 -
Waste Disposal Costs
Water Usage $6,399 1,000
Tgal
Water Disposal $11,548 1,000
Tgal
TOTAL YEARLY COSTS $339,295
RECOMMENDED SAVINGS* $77,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.7221: Lower temperature during the winter season and vice-versa $29,836 $550 $18,190
324,813
kWh
$11,646
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,559 $12,210 $7,870
140,533
kWh
$8,689
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $14,048 - $14,048
250,859
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,225 $2,000 $4,015
71,694
kWh
$2,210
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,323 $7,394 $1,579
28,195
kWh
$1,744
-
kW-mo/yr
-
06 3.4159: Replace treated water with well / surface water $3,200 $3,460 - - $3,200
-
Tgal
07 2.7135: Install occupancy sensors $2,333 $750 $2,333
41,668
kWh
- -
08 2.4239: Eliminate or reduce compressed air usage $1,530 $960 $986
17,604
kWh
$544
-
kW-mo/yr
-
TOTAL RECOMMENDED $77,054 $27,324 $49,021
875,366
kWh
$24,833
-
kW-mo/yr
$3,200
-
Tgal
TOTAL IMPLEMENTED $54,962 $10,904 $38,818
693,165
kWh
$16,144
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs