Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Photopolymer Printing Plates
NAICS 323120: Support Activities for Printing
SIC 2796: Platemaking and Related Services
Sales Range $50
M
to 100
M
# of Employees 66
Plant Area 100,000
ft2
Annual Production 1,500,000
units
Production Hrs. Annual 8,064
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,457 3,794,940
kWh
Electricity Demand $101,011 7,417
kW-mo/yr
Natural Gas $16,661 2,483
MMBtu
Waste Disposal Costs
Water Usage $1,564 229
Tgal
Water Disposal $6,419 229
Tgal
TOTAL YEARLY COSTS $368,112
RECOMMENDED SAVINGS* $62,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $51,568 $201,200 $51,568
805,754
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,414 $200 $6,414
100,212
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $2,091 $200 $2,091
32,675
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,040 $63 $1,580
24,679
kWh
$460
-
kW-mo/yr
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $651 $1,500 $651
10,173
kWh
-
TOTAL RECOMMENDED $62,764 $203,163 $62,303
973,493
kWh
$460
-
kW-mo/yr
TOTAL IMPLEMENTED $9,105 $1,763 $8,644
135,064
kWh
$460
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs