ITAC Assessment: TT0269
ITAC logo
ITAC Assessment: TT0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Manufactured Metal Products
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 57,900
ft2
Annual Production 2,000
units
Production Hrs. Annual 2,040
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,704 4,265,912
kWh
Electricity Demand $164,462 12,936
kW-mo/yr
Natural Gas $96,173 7,875
MMBtu
TOTAL YEARLY COSTS $446,339
RECOMMENDED SAVINGS* $49,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7242: Change zone reheat coils to variable air volume boxes $24,682 $2,000 $17,625
405,168
kWh
$7,058
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,069 $25,000 $3,366
77,377
kWh
$5,703
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $6,223 $27,500 - - $6,223 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,847 $3,500 $3,193
73,366
kWh
$655
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,648 $2,500 $2,605
59,874
kWh
$1,044
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $1,911 $11,000 - - - $1,911
-
MMBtu
TOTAL RECOMMENDED $49,380 $71,500 $26,788
615,784
kWh
$14,459
-
kW-mo/yr
$6,223 $1,911
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs