Assessment Year | 2022 |
---|---|
Principal Product | Plastics |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
168,000
ft2
|
Annual Production | 170,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,010,674 | 28,152,286 |
kWh
|
$0.036 | |
Electricity Demand | $622,425 | 102,672 |
kW-mo/yr
|
$6.06 | |
Electricity Fees | $(-88,314.0) | - |
|
- | |
Natural Gas | $82,162 | 7,661 |
MMBtu
|
$10.72 | |
Waste Disposal Costs | |||||
Water Usage | $33,838 | 10,747 |
Tgal
|
$3.15 | |
Water Disposal | $47,919 | 8,091 |
Tgal
|
$5.92 | |
TOTAL YEARLY COSTS | $1,708,704 | ||||
RECOMMENDED SAVINGS* | $96,181 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $4,223 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,947 | $60,000 |
$40,876
1,238,664
kWh
|
$5,071
-
kW-mo/yr
|
- | - | |
02 | 2.6123: Remove unneeded service lines to eliminate potential leaks | $17,027 | $10,000 | - | - | - | $17,027 | |
03 | 2.3212: Optimize plant power factor | $14,583 | $49,071 | - | - | $14,583 | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,268 | $3,480 |
$9,268
280,846
kWh
|
- | - | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $4,223 | $500 | - | - | $4,223 | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,691 | $2,695 |
$2,691
81,545
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,442 | $6,000 |
$1,949
59,070
kWh
|
$493
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $96,181 | $131,746 |
$54,784
1,660,125
kWh
|
$5,564
-
kW-mo/yr
|
$18,806 | $17,027 | ||
TOTAL IMPLEMENTED | $4,223 | $500 | - | - | $4,223 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs