Assessment Year | 2021 |
---|---|
Principal Product | Automotive Exterior Products - spoilers & bsm |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 117 |
Plant Area |
45,600
ft2
|
Annual Production | 340,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $555,156 | 8,073,600 |
kWh
|
$0.069 | |
Electricity Demand | $230,563 | 16,440 |
kW-mo/yr
|
$14.02 | |
Natural Gas | $94,458 | 12,050 |
MMBtu
|
$7.84 | |
Waste Disposal Costs | |||||
Water Usage | $25,810 | 3,734 |
Tgal
|
$6.91 | |
Water Disposal | $7,796 | 3,734 |
Tgal
|
$2.09 | |
TOTAL YEARLY COSTS | $913,783 | ||||
RECOMMENDED SAVINGS* | $66,201 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $8,669 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9113: Use solar heat for heat | $44,686 | $476,000 |
$44,686
647,625
kWh
|
- | |
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,441 | $15,000 |
$5,674
82,236
kWh
|
$1,767
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,405 | $1,640 |
$4,228
61,276
kWh
|
$1,177
-
kW-mo/yr
|
|
04 | 2.2511: Insulate bare equipment | $4,646 | $3,879 |
$4,646
67,339
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,023 | $2,762 |
$4,023
58,861
kWh
|
- | |
TOTAL RECOMMENDED | $66,201 | $499,281 |
$63,257
917,337
kWh
|
$2,944
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $8,669 | $6,641 |
$8,669
126,200
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs