ITAC Assessment: TT0262
ITAC logo
ITAC Assessment: TT0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Automotive Exterior Products - spoilers & bsm
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area 45,600
ft2
Annual Production 340,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $555,156 8,073,600
kWh
Electricity Demand $230,563 16,440
kW-mo/yr
Natural Gas $94,458 12,050
MMBtu
Waste Disposal Costs
Water Usage $25,810 3,734
Tgal
Water Disposal $7,796 3,734
Tgal
TOTAL YEARLY COSTS $913,783
RECOMMENDED SAVINGS* $66,201 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9113: Use solar heat for heat $44,686 $476,000 $44,686
647,625
kWh
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $7,441 $15,000 $5,674
82,236
kWh
$1,767
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,405 $1,640 $4,228
61,276
kWh
$1,177
-
kW-mo/yr
04 2.2511: Insulate bare equipment $4,646 $3,879 $4,646
67,339
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,023 $2,762 $4,023
58,861
kWh
-
TOTAL RECOMMENDED $66,201 $499,281 $63,257
917,337
kWh
$2,944
-
kW-mo/yr
TOTAL IMPLEMENTED $8,669 $6,641 $8,669
126,200
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs