ITAC Assessment: TT0248
ITAC logo
ITAC Assessment: TT0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Oven door glass, refrigerator shelving
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $10
M
to 50
M
# of Employees 267
Plant Area 244,000
ft2
Annual Production 2,250,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,126,881 28,403,259
kWh
Electricity Demand $834,187 71,564
kW-mo/yr
Natural Gas $206,950 30,187
MMBtu
Waste Disposal Costs
Water Usage $109,180 211,498
Tgal
Water Disposal $117,458 211,498
Tgal
TOTAL YEARLY COSTS $2,394,656
RECOMMENDED SAVINGS* $903,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $852,090 $500,000 - $852,090 -
02 2.2437: Recover waste heat from equipment $43,748 $61,200 - - $43,748
-
MMBtu
03 2.2511: Insulate bare equipment $7,421 $11,190 $4,105
102,632
kWh
- $3,316
-
MMBtu
TOTAL RECOMMENDED $903,259 $572,390 $4,105
102,632
kWh
$852,090 $47,064
-
MMBtu
TOTAL IMPLEMENTED $7,421 $11,190 $4,105
102,632
kWh
- $3,316
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs