ITAC Assessment: TT0243
ITAC logo
ITAC Assessment: TT0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Porcelain tile
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $50
M
to 100
M
# of Employees 285
Plant Area 1,200,000
ft2
Annual Production 90,000
thousand feet
Production Hrs. Annual 7,728
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,802,392 51,306,918
kWh
Electricity Demand $1,267,407 190,482
kW-mo/yr
Natural Gas $2,264,724 738,585
MMBtu
Waste Disposal Costs
Water Usage $140,128 23,456
Tgal
TOTAL YEARLY COSTS $6,474,651
RECOMMENDED SAVINGS* $531,048 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $301,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $294,548 $574,658 $246,867
4,521,357
kWh
$47,681
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $84,184 $2,000 $12,364
216,000
kWh
$71,820
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $63,580 $248,619 - - - $63,580
04 2.2437: Recover waste heat from equipment $45,344 $83,600 - - $45,344
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $36,281 $7,500 $36,281
643,279
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,111 $600 $7,111
130,247
kWh
- - -
TOTAL RECOMMENDED $531,048 $916,977 $302,623
5,510,883
kWh
$119,501
-
kW-mo/yr
$45,344
-
MMBtu
$63,580
TOTAL IMPLEMENTED $301,659 $575,258 $253,978
4,651,604
kWh
$47,681
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs