ITAC Assessment: TT0221
ITAC logo
ITAC Assessment: TT0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Superconducting Magnets
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 29,880
ft2
Annual Production 120
units
Production Hrs. Annual 2,088
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,049 564,660
kWh
Electricity Demand $8,462 1,632
kW-mo/yr
Natural Gas $4,046 370
MMBtu
Waste Disposal Costs
Water Usage $2,492 356,000
Tgal
Water Disposal $4,078 356
Tgal
TOTAL YEARLY COSTS $75,127
RECOMMENDED SAVINGS* $18,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,132

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,132 $36,211 $9,069
91,313
kWh
$2,063
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $4,069 $2,280 $210
2,118
kWh
- $3,859
-
MMBtu
03 2.2437: Recover waste heat from equipment $1,958 $7,400 $1,827
18,396
kWh
$131
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $1,435 $30 $1,435
14,454
kWh
- -
05 2.2511: Insulate bare equipment $33 $80 - - $33
-
MMBtu
TOTAL RECOMMENDED $18,627 $46,001 $12,541
126,281
kWh
$2,194
-
kW-mo/yr
$3,892
-
MMBtu
TOTAL IMPLEMENTED $11,132 $36,211 $9,069
91,313
kWh
$2,063
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs