Assessment Year | 2019 |
---|---|
Principal Product | Superconducting Magnets |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 48 |
Plant Area |
29,880
ft2
|
Annual Production | 120
units
|
Production Hrs. Annual | 2,088
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $56,049 | 564,660 |
kWh
|
$0.099 | |
Electricity Demand | $8,462 | 1,632 |
kW-mo/yr
|
$5.19 | |
Natural Gas | $4,046 | 370 |
MMBtu
|
$10.94 | |
Waste Disposal Costs | |||||
Water Usage | $2,492 | 356,000 |
Tgal
|
$0.007 | |
Water Disposal | $4,078 | 356 |
Tgal
|
$11.46 | |
TOTAL YEARLY COSTS | $75,127 | ||||
RECOMMENDED SAVINGS* | $18,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,132 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,132 | $36,211 |
$9,069
91,313
kWh
|
$2,063
-
kW-mo/yr
|
- | |
02 | 2.7261: Install timers and/or thermostats | $4,069 | $2,280 |
$210
2,118
kWh
|
- |
$3,859
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $1,958 | $7,400 |
$1,827
18,396
kWh
|
$131
-
kW-mo/yr
|
- | |
04 | 2.6218: Turn off equipment when not in use | $1,435 | $30 |
$1,435
14,454
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $33 | $80 | - | - |
$33
-
MMBtu
|
|
TOTAL RECOMMENDED | $18,627 | $46,001 |
$12,541
126,281
kWh
|
$2,194
-
kW-mo/yr
|
$3,892
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,132 | $36,211 |
$9,069
91,313
kWh
|
$2,063
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs