ITAC Assessment: TT0216
ITAC logo
ITAC Assessment: TT0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Airbag Modules and Textiles
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 280,000
ft2
Annual Production 25,158,054
units
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $838,532 15,568,725
kWh
Electricity Demand $434,208 30,578
kW-mo/yr
Electricity Fees $34,907 -
Natural Gas $216,573 26,686
MMBtu
Waste Disposal Costs
Water Usage $65,390 18,800
Tgal
Water Disposal $132,681 12,400
Tgal
TOTAL YEARLY COSTS $1,722,291
RECOMMENDED SAVINGS* $44,366 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings
01 2.8114: Change rate schedules or other changes in utility service $21,451 $2,000 - - - - $21,451
02 2.3212: Optimize plant power factor $14,507 $20,000 - - $14,507 - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,494 $3,750 $3,267
60,653
kWh
$1,227
-
kW-mo/yr
- - -
04 2.2136: Install / repair insulation on steam lines $1,254 $1,710 - - - $1,254
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $1,220 $20 $896
16,644
kWh
$324
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,054 $3,559 $1,054
19,561
kWh
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $386 $1,530 $284
5,273
kWh
$102
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $44,366 $32,569 $5,501
102,131
kWh
$1,653
-
kW-mo/yr
$14,507 $1,254
-
MMBtu
$21,451
TOTAL IMPLEMENTED $22,915 $30,569 $5,501
102,131
kWh
$1,653
-
kW-mo/yr
$14,507 $1,254
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs