ITAC Assessment: TT0215
ITAC logo
ITAC Assessment: TT0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wood Floors Tractor Trailer/Dry Vans
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 465,594
ft2
Annual Production 16,800,000
thousand feet
Production Hrs. Annual 7,512
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $871,037 22,354,330
kWh
Electricity Demand $461,202 55,442
kW-mo/yr
LPG $154,804 6,186
MMBtu
Wood $42,800 20,000
MMBtu
Waste Disposal Costs
Water Usage $36,146 8,666,600
Tgal
Water Disposal $26,324 3,701
Tgal
TOTAL YEARLY COSTS $1,592,313
RECOMMENDED SAVINGS* $181,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,764

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Water Usage Savings Water Disposal Savings Primary Product Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $84,000 $369,200 - - $84,000
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $34,605 $163,091 $25,080
643,051
kWh
$9,525
-
kW-mo/yr
- - - -
03 2.2113: Repair or replace steam traps $15,764 $1,150 - - $13,696
-
MMBtu
$2,068
-
Tgal
- -
04 2.3212: Optimize plant power factor $14,409 $72,000 - - - - - $14,409
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,811 $5,500 $8,802
225,688
kWh
$3,009
-
kW-mo/yr
- - - -
06 2.1242: Minimize boiler blowdown with better feedwater treatment $9,181 $40,600 - - $9,000
-
MMBtu
$67
-
Tgal
$114
-
Tgal
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,783 $15,000 $4,783
122,640
kWh
- - - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,173 $6,450 $2,925
75,000
kWh
$1,248
-
kW-mo/yr
- - - -
09 2.2511: Insulate bare equipment $2,400 $4,140 - - $2,400
-
MMBtu
- - -
TOTAL RECOMMENDED $181,126 $677,131 $41,590
1,066,379
kWh
$13,782
-
kW-mo/yr
$109,096
-
MMBtu
$2,135
-
Tgal
$114
-
Tgal
$14,409
TOTAL IMPLEMENTED $15,764 $1,150 - - $13,696
-
MMBtu
$2,068
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Water Usage Savings Water Disposal Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs