Assessment Year | 2019 |
---|---|
Principal Product | Wood Floors Tractor Trailer/Dry Vans |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
465,594
ft2
|
Annual Production | 16,800,000
thousand feet
|
Production Hrs. Annual | 7,512
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $871,037 | 22,354,330 |
kWh
|
$0.039 | |
Electricity Demand | $461,202 | 55,442 |
kW-mo/yr
|
$8.32 | |
LPG | $154,804 | 6,186 |
MMBtu
|
$25.02 | |
Wood | $42,800 | 20,000 |
MMBtu
|
$2.14 | |
Waste Disposal Costs | |||||
Water Usage | $36,146 | 8,666,600 |
Tgal
|
$0.004 | |
Water Disposal | $26,324 | 3,701 |
Tgal
|
$7.11 | |
TOTAL YEARLY COSTS | $1,592,313 | ||||
RECOMMENDED SAVINGS* | $181,126 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $15,764 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Water Usage Savings | Water Disposal Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $84,000 | $369,200 | - | - |
$84,000
-
MMBtu
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,605 | $163,091 |
$25,080
643,051
kWh
|
$9,525
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2113: Repair or replace steam traps | $15,764 | $1,150 | - | - |
$13,696
-
MMBtu
|
$2,068
-
Tgal
|
- | - | |
04 | 2.3212: Optimize plant power factor | $14,409 | $72,000 | - | - | - | - | - | $14,409 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,811 | $5,500 |
$8,802
225,688
kWh
|
$3,009
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $9,181 | $40,600 | - | - |
$9,000
-
MMBtu
|
$67
-
Tgal
|
$114
-
Tgal
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,783 | $15,000 |
$4,783
122,640
kWh
|
- | - | - | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,173 | $6,450 |
$2,925
75,000
kWh
|
$1,248
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.2511: Insulate bare equipment | $2,400 | $4,140 | - | - |
$2,400
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $181,126 | $677,131 |
$41,590
1,066,379
kWh
|
$13,782
-
kW-mo/yr
|
$109,096
-
MMBtu
|
$2,135
-
Tgal
|
$114
-
Tgal
|
$14,409 | ||
TOTAL IMPLEMENTED | $15,764 | $1,150 | - | - |
$13,696
-
MMBtu
|
$2,068
-
Tgal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Water Usage Savings | Water Disposal Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs