ITAC Assessment: TT0212
ITAC logo
ITAC Assessment: TT0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Cars
NAICS 336111: Automobile Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range greater than $500
M
# of Employees 6,500
Plant Area 4,500,000
ft2
Annual Production 315,000
units
Production Hrs. Annual 8,064
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,739,791 215,054,000
kWh
Electricity Demand $3,372,002 454,194
kW-mo/yr
Natural Gas $2,466,613 803,743
MMBtu
Waste Disposal Costs
Water Usage $730,738 326,952
Tgal
Water Disposal $417,942 278,628
Tgal
TOTAL YEARLY COSTS $12,727,086
RECOMMENDED SAVINGS* $326,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7212: Install or upgrade insulation on hvac distribution systems $76,685 $250,172 $76,685
2,873,165
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $68,776 $32,000 $48,642
1,822,464
kWh
$20,134
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $68,707 $330,000 $68,707
2,574,261
kWh
- -
04 2.7212: Install or upgrade insulation on hvac distribution systems $38,635 $13,000 $38,635
1,447,545
kWh
- -
05 3.4155: Meter waste water $34,128 $1,900 - - $34,128
-
Tgal
06 2.7491: Insulate glazing, walls, ceilings, and roofs $17,427 $79,168 $17,427
652,938
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,248 $34,845 $6,056
226,829
kWh
$3,192
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,795 $16,665 $4,451
166,690
kWh
$2,344
-
kW-mo/yr
-
09 2.4113: Install motor voltage controller on lightly loaded motors $3,775 $5,000 $2,390
89,547
kWh
$1,385
-
kW-mo/yr
-
10 2.7212: Install or upgrade insulation on hvac distribution systems $2,270 $1,720 $1,644
61,583
kWh
$626
-
kW-mo/yr
-
11 2.7135: Install occupancy sensors $283 $250 $283
10,591
kWh
- -
TOTAL RECOMMENDED $326,729 $764,720 $264,920
9,925,613
kWh
$27,681
-
kW-mo/yr
$34,128
-
Tgal
TOTAL IMPLEMENTED $145,597 $52,150 $89,950
3,370,147
kWh
$21,519
-
kW-mo/yr
$34,128
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs