ITAC Assessment: TT0208
ITAC logo
ITAC Assessment: TT0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Medical socks, Stockings, Castings, and Bandages
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $1
M
to 5
M
# of Employees 175
Plant Area 260,000
ft2
Annual Production 4,560,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,254 7,863,584
kWh
Electricity Demand $174,098 13,608
kW-mo/yr
Natural Gas $206,475 37,781
MMBtu
Waste Disposal Costs
Water Usage $124,597 3,246,523
Tgal
Water Disposal $187,672 3,247
Tgal
TOTAL YEARLY COSTS $999,096
RECOMMENDED SAVINGS* $41,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,976 $33,750 $16,133
414,720
kWh
$8,843
-
kW-mo/yr
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,000 $2,500 - - $6,000
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,089 $400 $4,089
105,120
kWh
- -
04 2.7135: Install occupancy sensors $3,716 $2,030 $3,716
95,514
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,732 $2,250 $1,765
45,360
kWh
$967
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $439 $600 $283
7,272
kWh
$156
-
kW-mo/yr
-
TOTAL RECOMMENDED $41,952 $41,530 $25,986
667,986
kWh
$9,966
-
kW-mo/yr
$6,000
-
MMBtu
TOTAL IMPLEMENTED $4,089 $400 $4,089
105,120
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs