ITAC Assessment: TT0206
ITAC logo
ITAC Assessment: TT0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Repair Buses
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range less than $500
k
# of Employees 45
Plant Area 60,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,264
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,132 830,040
kWh
Electricity Demand $24,689 2,323
kW-mo/yr
Natural Gas $7,188 721
MMBtu
Waste Disposal Costs
Water Usage $3,160 819,060
Tgal
Water Disposal $3,036 1,841
Tgal
TOTAL YEARLY COSTS $100,205
RECOMMENDED SAVINGS* $23,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,406 $32,616 $11,725
156,548
kWh
$4,681
-
kW-mo/yr
- - - -
02 2.4313: Provide proper maintenance of motor driven equipment $6,182 $25 $49
648
kWh
- - $2,895
-
Tgal
$1,238
-
Tgal
$2,000
03 2.7261: Install timers and/or thermostats $428 $150 $156
2,089
kWh
- $272
-
MMBtu
- - -
TOTAL RECOMMENDED $23,016 $32,791 $11,930
159,285
kWh
$4,681
-
kW-mo/yr
$272
-
MMBtu
$2,895
-
Tgal
$1,238
-
Tgal
$2,000
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs