ITAC Assessment: TT0166
ITAC logo
ITAC Assessment: TT0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Baked Goods Bread / Rolls
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area 238,000
ft2
Annual Production 4,800,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $405,655 6,380,128
kWh
Electricity Demand $140,110 12,346
kW-mo/yr
Natural Gas $284,551 37,878
MMBtu
Other Gas $23,905 1,295
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Water Consumption Savings
01 2.4239: Eliminate or reduce compressed air usage $18,985 $7,200 $18,985
296,640
kWh
- - - -
02 2.7135: Install occupancy sensors $13,610 $7,891 $13,610
212,638
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,168 $13,756 $10,500
164,077
kWh
$2,668
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $11,418 $8,000 - - $10,530
-
MMBtu
$888
-
MMBtu
-
05 2.8117: Install sub-metering equipment $11,364 $600 - - - - $11,364
-
Tgal
06 2.2511: Insulate bare equipment $3,337 $3,980 $3,337
52,149
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,809 $3,000 $2,260
35,311
kWh
$549
-
kW-mo/yr
- - -
08 2.2511: Insulate bare equipment $1,393 $585 - - $1,286
-
MMBtu
$107
-
MMBtu
-
09 2.6218: Turn off equipment when not in use $520 $20 $418
6,535
kWh
$102
-
kW-mo/yr
- - -
10 2.7425: Clean or color roof to reduce solar load $138 $120 $138
2,172
kWh
- - - -
TOTAL RECOMMENDED $76,742 $45,152 $49,248
769,522
kWh
$3,319
-
kW-mo/yr
$11,816
-
MMBtu
$995
-
MMBtu
$11,364
-
Tgal
TOTAL IMPLEMENTED $38,897 $25,476 $12,898
201,560
kWh
$3,217
-
kW-mo/yr
$10,530
-
MMBtu
$888
-
MMBtu
$11,364
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs