ITAC Assessment: TT0153
ITAC logo
ITAC Assessment: TT0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Aerosol Manufacturing
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 142,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,408 3,602,100
kWh
Electricity Demand $90,142 15,708
kW-mo/yr
Natural Gas $44,500 5,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,747

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $39,935 $152,353 $30,726
772,022
kWh
$9,209
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $7,960 $15,939 $7,960
199,995
kWh
- -
03 2.1133: Adjust burners for efficient operation $6,030 $12,000 - - $6,030
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,651 $225 $2,834
71,201
kWh
$817
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $2,708 $500 $2,708
68,040
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,247 $3,000 $2,247
56,457
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,849 $125 $1,435
36,061
kWh
$414
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,201 $1,750 $1,028
25,818
kWh
$173
-
kW-mo/yr
-
TOTAL RECOMMENDED $65,581 $185,892 $48,938
1,229,594
kWh
$10,613
-
kW-mo/yr
$6,030
-
MMBtu
TOTAL IMPLEMENTED $7,747 $3,350 $6,516
163,719
kWh
$1,231
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs