ITAC Assessment: TT0150
ITAC logo
ITAC Assessment: TT0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Fabricated Metal Products
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 376
Plant Area 250,000
ft2
Annual Production 27,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $710,523 10,589,635
kWh
Electricity Demand $296,340 22,481
kW-mo/yr
Natural Gas $290,121 39,305
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $19,615 $36,000 - $19,615
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $13,344 $10,000 - - $13,344
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,515 $3,000 $8,272
123,456
kWh
$3,243
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,597 $63 $4,738
70,711
kWh
$1,859
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,475 $3,500 $4,330
64,620
kWh
$145
-
kW-mo/yr
-
06 2.7122: Disconnect ballasts $1,276 $120 $669
9,984
kWh
$607
-
kW-mo/yr
-
07 2.6218: Turn off equipment when not in use $891 $275 $891
13,303
kWh
- -
TOTAL RECOMMENDED $57,713 $52,958 $18,900
282,074
kWh
$25,469
-
kW-mo/yr
$13,344
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs