ITAC Assessment: TT0140
ITAC logo
ITAC Assessment: TT0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Discrete Rubber Parts
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 196,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,413 2,835,600
kWh
Electricity Demand $135,616 11,218
kW-mo/yr
Electricity Fees $3,785 -
Natural Gas $202,132 32,475
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.1231: Establish burner maintenance schedule for boilers $3,000 $2,000 - - $3,000
-
MMBtu
- -
02 2.2136: Install / repair insulation on steam lines $1,068 $1,545 - - $1,068
-
MMBtu
- -
03 2.2441: Preheat boiler makeup water with waste process heat $4,428 $8,000 - - $3,728
-
MMBtu
$343
-
Tgal
$357
-
gal
04 2.2442: Preheat combustion air with waste heat $2,430 $4,000 - - $2,047
-
MMBtu
$188
-
Tgal
$195
-
gal
05 2.3212: Optimize plant power factor $25,238 $36,000 - $25,238
-
kW-mo/yr
- - -
06 2.4239: Eliminate or reduce compressed air usage $1,930 $825 $1,304
20,702
kWh
$626
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,206 $125 $2,167
34,387
kWh
$1,039
-
kW-mo/yr
- - -
08 2.6218: Turn off equipment when not in use $3,333 $50 $900
14,300
kWh
$433
-
kW-mo/yr
$2,000
-
MMBtu
- -
09 2.7122: Disconnect ballasts $358 $50 $283
4,503
kWh
$75
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $44,991 $52,595 $4,654
73,892
kWh
$27,411
-
kW-mo/yr
$11,843
-
MMBtu
$531
-
Tgal
$552
-
gal
TOTAL IMPLEMENTED $36,203 $39,770 $3,350
53,190
kWh
$26,785
-
kW-mo/yr
$6,068
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs