ITAC Assessment: TT0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Mobile homes
NAICS 321991: Manufactured Home (Mobile Home) Manufacturing
SIC 2451: Mobile Homes
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area 1,000,000
ft2
Annual Production 240
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,130 1,004,523
kWh
Electricity Demand $39,526 6,140
kW-mo/yr
LPG $45,487 29,675
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,065

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,360 $822 $5,943
57,146
kWh
$4,417
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,154 $6,230 $1,154
10,792
kWh
- -
03 2.7145: Install skylights $8,488 $33,000 $8,488
79,335
kWh
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,191 $5,200 $6,191
57,859
kWh
- -
05 2.1332: Convert combustion equipment to burn natural gas $26,063 $4,272 - - $26,063
TOTAL RECOMMENDED $52,256 $49,524 $21,776
205,132
kWh
$4,417
-
kW-mo/yr
$26,063
TOTAL IMPLEMENTED $46,065 $44,324 $15,585
147,273
kWh
$4,417
-
kW-mo/yr
$26,063
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs