Assessment Year | 2014 |
---|---|
Principal Product | Glass Encapsulation Assemblies |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 280 |
Plant Area |
223,807
ft2
|
Annual Production | 2,400,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $620,114 | 9,736,800 |
kWh
|
$0.064 |
Electricity Demand | $295,547 | 19,805 |
kW-mo/yr
|
$14.92 |
Electricity Fees | $(-61,589.0) | - |
|
- |
Natural Gas | $91,643 | 9,181 |
MMBtu
|
$9.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,283 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,283 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $5,874 | $24,000 | - |
$5,874
-
kW-mo/yr
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $9,406 | $7,500 |
$7,093
110,825
kWh
|
$2,313
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,851 | $4,000 |
$5,911
92,354
kWh
|
$1,940
-
kW-mo/yr
|
- | |
04 | 2.7122: Disconnect ballasts | $346 | $110 |
$262
4,095
kWh
|
$84
-
kW-mo/yr
|
- | |
05 | 2.7144: Install spectral reflectors / delamp | $2,806 | $4,900 |
$1,452
22,680
kWh
|
$1,354
-
kW-mo/yr
|
- | |
06 | 4.132: Purchase new equipment to reduce material use / cost | $43,000 | $35,238 | - | - |
$43,000
-
lb
|
|
TOTAL RECOMMENDED | $69,283 | $75,748 |
$14,718
229,954
kWh
|
$11,565
-
kW-mo/yr
|
$43,000
-
lb
|
||
TOTAL IMPLEMENTED | $26,283 | $40,510 |
$14,718
229,954
kWh
|
$11,565
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs