Assessment Year | 2014 |
---|---|
Principal Product | HVAC Units |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 1,750 |
Plant Area |
700,000
ft2
|
Annual Production | 53,300
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,005,986 | 25,288,189 |
kWh
|
$0.040 |
Electricity Demand | $673,956 | 51,842 |
kW-mo/yr
|
$13.00 |
Electricity Fees | $115,697 | - |
|
- |
Natural Gas | $363,160 | 71,557 |
MMBtu
|
$5.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $134,095 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $134,095 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4131: Size electric motors for peak operating efficiency | $16,604 | $5,500 |
$11,495
287,398
kWh
|
$5,109
-
kW-mo/yr
|
|
02 | 2.4226: Use / purchase optimum sized compressor | $103,306 | $10,000 |
$71,482
1,787,040
kWh
|
$31,824
-
kW-mo/yr
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,755 | $100 |
$7,442
186,045
kWh
|
$3,313
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,486 | $9,660 |
$1,105
27,628
kWh
|
$1,381
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $326 | $50 |
$225
5,629
kWh
|
$101
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $618 | $2,285 |
$426
10,652
kWh
|
$192
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $134,095 | $27,595 |
$92,175
2,304,392
kWh
|
$41,920
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $134,095 | $27,595 |
$92,175
2,304,392
kWh
|
$41,920
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs