Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product HVAC Units
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 1,750
Plant Area 700,000
ft2
Annual Production 53,300
units
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,005,986 25,288,189
kWh
Electricity Demand $673,956 51,842
kW-mo/yr
Electricity Fees $115,697 -
Natural Gas $363,160 71,557
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,095

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4131: Size electric motors for peak operating efficiency $16,604 $5,500 $11,495
287,398
kWh
$5,109
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $103,306 $10,000 $71,482
1,787,040
kWh
$31,824
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $10,755 $100 $7,442
186,045
kWh
$3,313
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,486 $9,660 $1,105
27,628
kWh
$1,381
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $326 $50 $225
5,629
kWh
$101
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $618 $2,285 $426
10,652
kWh
$192
-
kW-mo/yr
TOTAL RECOMMENDED $134,095 $27,595 $92,175
2,304,392
kWh
$41,920
-
kW-mo/yr
TOTAL IMPLEMENTED $134,095 $27,595 $92,175
2,304,392
kWh
$41,920
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs