ITAC Assessment: TT0115
ITAC logo
ITAC Assessment: TT0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Plastics and Garden Hose
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 720,000
ft2
Annual Production 300,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,825,335 47,055,822
kWh
Electricity Demand $1,267,185 101,864
kW-mo/yr
Natural Gas $1,953,000 434,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $270,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1243: Use heat from boiler blowdown to preheat boiler feed water $18,000 $50,000 - - - $18,000
-
MMBtu
02 2.2127: Flash condensate to produce lower pressure steam $18,000 $50,000 - - - $18,000
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $21,000 $50,000 - - - $21,000
-
MMBtu
04 2.3212: Optimize plant power factor $32,990 $129,250 - - $32,990 -
05 2.3411: Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $146,360 $450,000 - - $96,360 $50,000
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,000 $4,000 $4,000
60,882
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,635 $2,500 $1,138
29,170
kWh
$497
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,984 $20,000 $11,821
303,096
kWh
$5,163
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,635 $20,000 $8,097
207,612
kWh
$3,538
-
kW-mo/yr
- -
TOTAL RECOMMENDED $270,604 $775,750 $25,056
600,760
kWh
$9,198
-
kW-mo/yr
$129,350 $107,000
-
MMBtu
TOTAL IMPLEMENTED $36,000 $100,000 - - - $36,000
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs