ITAC Assessment: TT0112
ITAC logo
ITAC Assessment: TT0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Hydraulic Cylinders
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 42,800
ft2
Annual Production 44,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,243 785,600
kWh
Natural Gas $17,448 1,874
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,461 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,201

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2314: Replace heat treating oven with more efficient unit $4,915 $4,690 $(-4,552.0)
(-46,926)
kWh
$9,467
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,630 $2,600 $1,630
16,803
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $145 $700 $145
1,492
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,571 $25,960 $8,571
88,358
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,801 $5,122 $1,801
18,570
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $54 $394 $54
562
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,345 $15,200 $1,345
13,870
kWh
-
TOTAL RECOMMENDED $18,461 $54,666 $8,994
92,729
kWh
$9,467
-
MMBtu
TOTAL IMPLEMENTED $12,201 $34,776 $12,201
125,785
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs