Assessment Year | 2013 |
---|---|
Principal Product | Anodizing / Plating / Painting |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
42,000
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $70,241 | 1,138,500 |
kWh
|
$0.062 |
Electricity Demand | $43,903 | 3,785 |
kW-mo/yr
|
$11.60 |
Electricity Fees | $13,001 | - |
|
- |
Natural Gas | $23,548 | 2,337 |
MMBtu
|
$10.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,874 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,874 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2515: Use optimum thickness insulation | $11,651 | $2,925 |
$11,035
177,990
kWh
|
- |
$616
-
MMBtu
|
|
02 | 2.4224: Upgrade controls on compressors | $12,842 | $21,000 |
$8,835
142,500
kWh
|
$4,007
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,735 | $3,000 |
$3,268
52,704
kWh
|
$1,467
-
kW-mo/yr
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $82 | $20 |
$65
1,051
kWh
|
$17
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $320 | $50 |
$223
3,604
kWh
|
$96
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $78 | $25 |
$54
874
kWh
|
$23
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,203 | $14,000 |
$4,333
69,888
kWh
|
$1,870
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $374 | $720 |
$261
4,212
kWh
|
$113
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $74 | $600 |
$52
832
kWh
|
$22
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $166 | $2,000 |
$116
1,872
kWh
|
$50
-
kW-mo/yr
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,176 | $4,134 |
$1,520
24,528
kWh
|
$656
-
kW-mo/yr
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $110 | $1,092 |
$77
1,238
kWh
|
$33
-
kW-mo/yr
|
- | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $64 | $120 |
$51
835
kWh
|
$13
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $38,874 | $49,686 |
$29,890
482,127
kWh
|
$8,368
-
kW-mo/yr
|
$616
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,874 | $49,686 |
$29,890
482,127
kWh
|
$8,368
-
kW-mo/yr
|
$616
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs