ITAC Assessment: TT0097
ITAC logo
ITAC Assessment: TT0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Automotive Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range greater than $500
M
# of Employees 1,200
Plant Area 1,000,000
ft2
Annual Production 822,230
units
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,199,769 31,494,821
kWh
Electricity Demand $925,286 68,631
kW-mo/yr
Electricity Fees $47,885 -
Natural Gas $108,907 29,844
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,193

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $62,026 $78,780 $13,762
362,150
kWh
$33,160
-
kW-mo/yr
$15,104
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,306 $19,700 $21,748
572,312
kWh
$3,558
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $63,167 $106,204 $34,216
900,432
kWh
$19,451
-
kW-mo/yr
$9,500
TOTAL RECOMMENDED $150,499 $204,684 $69,726
1,834,894
kWh
$56,169
-
kW-mo/yr
$24,604
TOTAL IMPLEMENTED $125,193 $184,984 $47,978
1,262,582
kWh
$52,611
-
kW-mo/yr
$24,604
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs