ITAC Assessment: TT0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Treated Wood-Railroad
NAICS 321114: Wood Preservation
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 500,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,849 3,186,750
kWh
Electricity Demand $36,264 10,220
kW-mo/yr
Natural Gas $561,583 94,149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $382,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $463 - $463
5,144
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,193 $1,753 $5,193
57,700
kWh
-
03 2.2135: Repair and eliminate steam leaks $26,105 $10,000 - $26,105
-
MMBtu
04 2.4224: Upgrade controls on compressors $1,892 $1,000 $1,892
21,022
kWh
-
05 2.2614: Use cooling tower or economizer to replace chiller cooling $18,900 $2,000 $18,900
210,300
kWh
-
06 3.5311: Recover and reuse waste material $330,000 $630,000 - $330,000
-
MMBtu
TOTAL RECOMMENDED $382,553 $644,753 $26,448
294,166
kWh
$356,105
-
MMBtu
TOTAL IMPLEMENTED $28,460 $11,000 $2,355
26,166
kWh
$26,105
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs