ITAC Assessment: TT0093
ITAC logo
ITAC Assessment: TT0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Plastics Packaging
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range less than $500
k
# of Employees 42
Plant Area 1,001
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,750 1,261,440
kWh
Electricity Demand $55,511 5,397
kW-mo/yr
Electricity Fees $5,622 -
LPG $13,538 838
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,234 $10,343 $21,234
298,845
kWh
02 2.9121: Install wind powered electric generator $29,491 $250,000 $29,491
249,924
kWh
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,625 $52,000 $3,625
56,640
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,350 $800 $8,350
92,746
kWh
05 2.4133: Use most efficient type of electric motors $1,014 $7,685 $1,014
14,484
kWh
TOTAL RECOMMENDED $63,714 $320,828 $63,714
712,639
kWh
TOTAL IMPLEMENTED $12,989 $60,485 $12,989
163,870
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs