ITAC Assessment: TT0083
ITAC logo
ITAC Assessment: TT0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Practice Bomb Shells
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $500
k
to 1
M
# of Employees 142
Plant Area 82,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,675 1,510,200
kWh
Electricity Demand $90,883 7,199
kW-mo/yr
Natural Gas $66,480 8,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $9,142 $15,000 $9,142
-
kW-mo/yr
- -
02 2.7145: Install skylights $2,883 $36,500 - $2,883 -
03 2.8113: Purchase gas directly from a contract gas supplier $14,378 $1,200 - - $14,378
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $337 $29,076 - $337 -
05 2.4133: Use most efficient type of electric motors $267 $1,370 - $267 -
06 2.3511: Use plant owned transformers or lease transformers $5,312 $3,825 - $5,312 -
TOTAL RECOMMENDED $32,319 $86,971 $9,142
-
kW-mo/yr
$8,799 $14,378
-
MMBtu
TOTAL IMPLEMENTED $23,520 $16,200 $9,142
-
kW-mo/yr
- $14,378
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs