ITAC Assessment: TT0082
ITAC logo
ITAC Assessment: TT0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 50
Plant Area 116,640
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,337 1,170,488
kWh
Electricity Demand $55,787 5,278
kW-mo/yr
Electricity Fees $12,881 -
Natural Gas $27,251 4,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,923 $18,044 $6,923
115,439
kWh
-
02 2.7135: Install occupancy sensors $4,602 $28,092 $4,602
76,744
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,878 $11,643 $1,878
31,309
kWh
-
04 2.4226: Use / purchase optimum sized compressor $1,256 $1,480 $1,256
20,932
kWh
-
05 2.8121: Apply for tax-free status for energy purchases $1,673 $15 - $1,673
06 3.6192: Use a less expensive method of waste removal $2,834 $1,500 $2,834
47,236
kWh
-
07 2.5122: Replace high resistance ducts, pipes, and fittings $952 $2,625 $952
15,869
kWh
-
TOTAL RECOMMENDED $20,117 $63,399 $18,445
307,529
kWh
$1,673
TOTAL IMPLEMENTED $10,803 $22,164 $9,131
152,240
kWh
$1,673
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs