Assessment Year | 2011 |
---|---|
Principal Product | Valves |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $50 M to 100M |
# of Employees | 280 |
Plant Area |
192,000
ft2
|
Annual Production | 820,500
pieces
|
Production Hrs. Annual | 3,900
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $305,484 | 6,303,600 |
kWh
|
$0.048 |
Electricity Demand | $286,375 | 20,732 |
kW-mo/yr
|
$13.81 |
Electricity Fees | $(-51,683.8) | - |
|
- |
Natural Gas | $53,967 | 4,264 |
MMBtu
|
$12.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $60,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,600 | $38,200 |
$8,600
168,343
kWh
|
$6,900
-
kW-mo/yr
|
- | $3,100 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,100 | $205,600 |
$20,500
403,260
kWh
|
$16,600
-
kW-mo/yr
|
- | $1,000 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,900 | $1,800 |
$1,600
32,657
kWh
|
$300
-
kW-mo/yr
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $6,500 | $7,500 | - | - |
$6,500
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,900 | $4,900 |
$6,900
136,072
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,400 | $5 |
$700
13,607
kWh
|
$700
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $73,400 | $258,005 |
$38,300
753,939
kWh
|
$24,500
-
kW-mo/yr
|
$6,500
-
MMBtu
|
$4,100 | ||
TOTAL IMPLEMENTED | $60,000 | $245,605 |
$31,400
617,867
kWh
|
$24,500
-
kW-mo/yr
|
- | $4,100 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs