ITAC Assessment: TT0059
ITAC logo
ITAC Assessment: TT0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Valves
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 192,000
ft2
Annual Production 820,500
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,484 6,303,600
kWh
Electricity Demand $286,375 20,732
kW-mo/yr
Electricity Fees $(-51,683.8) -
Natural Gas $53,967 4,264
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,600 $38,200 $8,600
168,343
kWh
$6,900
-
kW-mo/yr
- $3,100
02 2.7142: Utilize higher efficiency lamps and/or ballasts $38,100 $205,600 $20,500
403,260
kWh
$16,600
-
kW-mo/yr
- $1,000
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,900 $1,800 $1,600
32,657
kWh
$300
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $6,500 $7,500 - - $6,500
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,900 $4,900 $6,900
136,072
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,400 $5 $700
13,607
kWh
$700
-
kW-mo/yr
- -
TOTAL RECOMMENDED $73,400 $258,005 $38,300
753,939
kWh
$24,500
-
kW-mo/yr
$6,500
-
MMBtu
$4,100
TOTAL IMPLEMENTED $60,000 $245,605 $31,400
617,867
kWh
$24,500
-
kW-mo/yr
- $4,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs