ITAC Assessment: TT0052
ITAC logo
ITAC Assessment: TT0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Medium Voltage Switchgear
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,354 5,041,186
kWh
Electricity Demand $205,883 13,235
kW-mo/yr
Natural Gas $133,487 17,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,444 $3,000 $7,843
201,360
kWh
$5,602
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $4,100 $7,000 - - $4,100
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,000 $15,450 $4,100
104,664
kWh
$2,900
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,700 $15,000 $1,350
34,830
kWh
$1,350
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,244 $40,450 $13,293
340,854
kWh
$9,852
-
kW-mo/yr
$4,100
-
MMBtu
TOTAL IMPLEMENTED $13,444 $3,000 $7,843
201,360
kWh
$5,602
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs