ITAC Assessment: TT0051
ITAC logo
ITAC Assessment: TT0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Welded Steeel and Fabricated Tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 95,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $433,484 8,616,900
kWh
Electricity Demand $436,399 28,944
kW-mo/yr
Electricity Fees $25,258 -
Natural Gas $89,539 10,238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $30,200 $50,000 - - $30,200
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,895 $4,900 $6,240
115,568
kWh
$655
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $8,500 $15,750 $8,500
157,096
kWh
- -
04 2.7135: Install occupancy sensors $1,300 $2,800 $1,300
23,772
kWh
- -
TOTAL RECOMMENDED $46,895 $73,450 $16,040
296,436
kWh
$655
-
kW-mo/yr
$30,200
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs