ITAC Assessment: TT0041
ITAC logo
ITAC Assessment: TT0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Frozen Dough
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 250,000
ft2
Annual Production 257,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,835,656 37,759,800
kWh
Electricity Demand $937,961 83,153
kW-mo/yr
Electricity Fees $43,810 -
LPG $183,962 15,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,330 - $1,330
16,620
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $25,865 - $18,975
254,305
kWh
$6,890
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $31,503 - $23,126
310,000
kWh
$8,377
-
kW-mo/yr
04 2.4131: Size electric motors for peak operating efficiency $9,530 - $9,530
148,284
kWh
-
05 2.4131: Size electric motors for peak operating efficiency $9,530 - $9,530
148,284
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $13,050 - $8,730
279,130
kWh
$4,320
-
kW-mo/yr
TOTAL RECOMMENDED $90,808 - $71,221
1,156,623
kWh
$19,587
-
kW-mo/yr
TOTAL IMPLEMENTED $45,883 - $33,186
605,750
kWh
$12,697
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs