ITAC Assessment: AS0135
ITAC logo
ITAC Assessment: AS0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product steel doors
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $5
M
to 10
M
# of Employees 135
Plant Area 102,500
ft2
Annual Production 72,000
pieces
Production Hrs. Annual 5,434
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,955 998,828
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,486 $11,750 $7,486
95,838
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,926 $9,358 $2,926
37,515
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $162 $307 $162
2,052
kWh
04 2.4133: Use most efficient type of electric motors $2,407 $3,205 $2,407
30,774
kWh
05 2.6212: Turn off equipment during breaks, reduce operating time $160 $100 $160
2,052
kWh
06 2.4314: Use synthetic lubricant $1,210 $1,410 $1,210
6,741
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,039 $350 $1,039
13,189
kWh
TOTAL RECOMMENDED $15,390 $26,480 $15,390
188,161
kWh
TOTAL IMPLEMENTED $5,337 $11,425 $5,337
59,497
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs