Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Tire Pressure Monitoring Systems
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range less than $500
k
# of Employees 75
Plant Area 45,750
ft2
Annual Production 312,000
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,645 2,006,640
kWh
Electricity Demand $39,595 3,185
kW-mo/yr
Electricity Fees $3,043 -
Natural Gas $19,763 1,549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,350 $6,490 $2,590
42,323
kWh
$450
-
kW-mo/yr
$310
02 2.7122: Disconnect ballasts $3,640 - $1,660
27,113
kWh
$1,300
-
kW-mo/yr
$680
03 2.7144: Install spectral reflectors / delamp $1,655 $3,220 $755
12,355
kWh
$590
-
kW-mo/yr
$310
04 2.2443: Re-use or recycle hot or cold process exhaust air $21,675 $30,000 $8,250
135,000
kWh
$13,425
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,980 $2,000 $3,540
57,960
kWh
$1,440
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,660 $800 $1,180
19,320
kWh
$480
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,960 $42,510 $17,975
294,071
kWh
$17,685
-
kW-mo/yr
$1,300
TOTAL IMPLEMENTED $10,280 $2,800 $6,380
104,393
kWh
$3,220
-
kW-mo/yr
$680
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs