Assessment Year | 2009 |
---|---|
Principal Product | Tire Pressure Monitoring Systems |
NAICS | 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | less than $500 k |
# of Employees | 75 |
Plant Area |
45,750
ft2
|
Annual Production | 312,000
pieces
|
Production Hrs. Annual | 2,400
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,645 | 2,006,640 |
kWh
|
$0.061 |
Electricity Demand | $39,595 | 3,185 |
kW-mo/yr
|
$12.43 |
Electricity Fees | $3,043 | - |
|
- |
Natural Gas | $19,763 | 1,549 |
MMBtu
|
$12.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,960 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,350 | $6,490 |
$2,590
42,323
kWh
|
$450
-
kW-mo/yr
|
$310 | |
02 | 2.7122: Disconnect ballasts | $3,640 | - |
$1,660
27,113
kWh
|
$1,300
-
kW-mo/yr
|
$680 | |
03 | 2.7144: Install spectral reflectors / delamp | $1,655 | $3,220 |
$755
12,355
kWh
|
$590
-
kW-mo/yr
|
$310 | |
04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $21,675 | $30,000 |
$8,250
135,000
kWh
|
$13,425
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,980 | $2,000 |
$3,540
57,960
kWh
|
$1,440
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,660 | $800 |
$1,180
19,320
kWh
|
$480
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $36,960 | $42,510 |
$17,975
294,071
kWh
|
$17,685
-
kW-mo/yr
|
$1,300 | ||
TOTAL IMPLEMENTED | $10,280 | $2,800 |
$6,380
104,393
kWh
|
$3,220
-
kW-mo/yr
|
$680 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs