ITAC Assessment: TT0027
ITAC logo
ITAC Assessment: TT0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Electric Motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 425
Plant Area 59,900
ft2
Annual Production 2,160,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,232 3,067,800
kWh
Natural Gas $101,666 9,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $1,297 $250 - - $1,297
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,204 $862 $1,204
13,965
kWh
- -
03 2.4133: Use most efficient type of electric motors $2,340 $5,000 $2,340
26,004
kWh
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $25,272 $22,000 $25,272
280,800
kWh
- -
05 2.1113: Reduce combustion air flow to optimum $16,221 $30,000 - $16,221
-
MMBtu
-
TOTAL RECOMMENDED $46,334 $58,112 $28,816
320,769
kWh
$16,221
-
MMBtu
$1,297
TOTAL IMPLEMENTED $3,637 $5,250 $2,340
26,004
kWh
- $1,297
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs