ITAC Assessment: TT0023
ITAC logo
ITAC Assessment: TT0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Condensed Milk
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 158,750
ft2
Annual Production 31,593
ton
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,631 6,272,880
kWh
Electricity Demand $131,662 12,617
kW-mo/yr
Electricity Fees $2,762 -
Natural Gas $1,408,583 182,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,401 $13,400 $14,360
206,035
kWh
$3,378
-
kW-mo/yr
- $3,663
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,785 $23,530 $12,600
180,806
kWh
$2,970
-
kW-mo/yr
- $3,215
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,700 $11,100 $6,790
97,455
kWh
$1,600
-
kW-mo/yr
- $1,310
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,685 $7,344 $2,400
34,532
kWh
$575
-
kW-mo/yr
- $710
05 2.2135: Repair and eliminate steam leaks $55,100 $20,000 - - $55,100
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $37,200 $1,000 - - $37,200
-
MMBtu
-
07 2.2136: Install / repair insulation on steam lines $13,600 $8,310 - - $13,600
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,275 $4,900 $12,275
194,706
kWh
- - -
09 2.2113: Repair or replace steam traps $1,750 $1,600 $1,750
25,065
kWh
- - -
10 2.3212: Optimize plant power factor $15,500 $32,800 - - - $15,500
TOTAL RECOMMENDED $188,996 $123,984 $50,175
738,599
kWh
$8,523
-
kW-mo/yr
$105,900
-
MMBtu
$24,398
TOTAL IMPLEMENTED $119,925 $35,810 $14,025
219,771
kWh
- $105,900
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs