ITAC Assessment: TT0020
ITAC logo
ITAC Assessment: TT0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Electrical Disconnect Switches
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $100
M
to 500
M
# of Employees 213
Plant Area 157,000
ft2
Annual Production 670,000
pieces
Production Hrs. Annual 78,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,402 5,030,200
kWh
Electricity Demand $130,068 12,040
kW-mo/yr
Natural Gas $74,290 7,817
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,980 $5,000 - - $1,980
-
MMBtu
02 2.8122: Use utility controlled power management $18,637 $5,000 - $18,637 -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,062 $1,000 $1,062
17,700
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,400 $2,900 $2,400
58,700
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,320 $3,300 $3,320
45,580
kWh
- -
TOTAL RECOMMENDED $27,399 $17,200 $6,782
121,980
kWh
$18,637 $1,980
-
MMBtu
TOTAL IMPLEMENTED $24,357 $11,200 $5,720
104,280
kWh
$18,637 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs