ITAC Assessment: TT0019
ITAC logo
ITAC Assessment: TT0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Printed Material
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 175
Plant Area 108,600
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,254 6,717,750
kWh
Electricity Demand $151,044 13,500
kW-mo/yr
Electricity Fees $27,508 -
Natural Gas $93,624 8,168
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,669 $30,000 $17,669
428,857
kWh
02 2.7313: Recycle air for heating, ventilation and air conditioning $7,295 $10,000 $7,295
176,900
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,586 $2,000 $1,586
72,957
kWh
04 2.4235: Remove or close off unneeded compressed air lines $1,835 $1,200 $1,835
44,557
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $18,183 $115,288 $18,183
504,111
kWh
TOTAL RECOMMENDED $46,568 $158,488 $46,568
1,227,382
kWh
TOTAL IMPLEMENTED $3,421 $3,200 $3,421
117,514
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs