ITAC Assessment: TS0024
ITAC logo
ITAC Assessment: TS0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MOLDED RUBBER PRODUCTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 700,000
lb
Production Hrs. Annual 0
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,943 1,455,744
kWh
Natural Gas $107,961 21,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,756 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,555 $25 $1,555
25,498
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $842 $214 $842
13,775
kWh
-
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $168 $105 $168
2,931
kWh
-
04 2.7492: Use proper thickness of insulation on building envelope $4,617 $4,028 - $4,617
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,293 $3,000 - $2,293
-
MMBtu
06 2.7494: Install storm windows and doors $281 $140 - $281
-
MMBtu
TOTAL RECOMMENDED $9,756 $7,512 $2,565
42,204
kWh
$7,191
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs