ITAC Assessment: TS0008
ITAC logo
ITAC Assessment: TS0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product POLYESTER/FIBERGLASS MOLDING
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $5
M
to 10
M
# of Employees 221
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,136
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,425 5,802,462
kWh
Natural Gas $24,444 4,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,227 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,657 - $1,657
36,049
kWh
-
02 2.2532: Use only amount of air necessary to prevent explosion hazard $18,700 $8,960 - $18,700
-
MMBtu
03 2.2511: Insulate bare equipment $1,200 $3,000 $1,200
26,377
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,670 $588 $1,670
36,342
kWh
-
TOTAL RECOMMENDED $23,227 $12,548 $4,527
98,768
kWh
$18,700
-
MMBtu
TOTAL IMPLEMENTED $4,527 $3,588 $4,527
98,768
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs